There are different stages involved when you plan to renovate your bathroom, and each one of them is important. Construction is one of these stages that determines the results in a significant way.
The constructor will demolish some areas, do plumbing rough-ins, tile installation, fixture hookups, and drywall hanging. An electrician will also be involved to do the wiring.
What Is Involved In The Construction Stage
A lot is involved in this stage, as this is when the renovation project starts. There will be demolitions and the shaping up of the space.
These steps are followed to avoid wasting time and making costly mistakes.
Demolition
Some areas of the bathroom will be torn down. Depending on the preferences, they may include the toilet, vanity, flooring, drywall, and cabinets. This is best left to a professional such as Orange County Drywall Repair.
It is about removing fixtures that will be re-installed or replaced. There will be a lot of debris during demolition.
Plumbing Rough-Ins
Before starting anything to do with the floor and fixture installation, rough-in is done. This means that drains and pipes are connected.
Electrical Work
Water heaters and lighting use electricity. At this point, the electrician will do the wiring of the power and lighting.
Insulation
With the different climate seasons throughout the year, your plumbing can take a hit. Thus, it should be protected during renovations. To do so, the contractor will insulate the bathroom.
Drywall Hanging And Mudding
This is the next step once the insulation is done. The drywall is hung, mud is applied, and sanding is done.
Tile Installation
Once the drywall has been hung successfully, it is time for tile installation. This includes wall and floor tiles.
After the tiles have been installed, the contractor will work on grouting and polishing them. This takes a few days to be completed
Cabinet Installation
Storage space is crucial to keep the bathroom organized. They are installed during construction and vanities should also be fixed at this point.
Flooring Installation
A bathroom would be incomplete without a beautiful floor. It is time to install the floor which takes about two days. You can already tell that your bathroom has taken shape.
Fixture Hook Ups
Bathroom fixtures such as lighting, faucets, toilets, sinks, HVAC, and showerheads are installed last. This is when you can say that the project has successfully been completed. Trim is also installed last.
After the fixtures are hooked up, painting of the walls and the ceiling should be done. Painting is important as it is an easy way of transforming the bathroom by giving it a fresh look.
All that is left is for you and the contractor to inspect the results. If there are any issues, they can be identified and fixed.
Take Away
Having an idea of what happens in the construction stage of a bathroom renovation is important. It helps you in preparing adequately considering it can be inconveniencing without an alternative bathroom.
You understand what to expect such as noise, debris, and dust. Nothing will be a surprise to you. Your constructor should give you details of the process.
kumpulan tools
slot gacor deposit 5rb
https://deposit5000.site/
slot malam
colombia88
luckytoto889
luckytoto
https://slothailand.baju-biru.site/
slot gacor deposit 5rb
colombia88
pipa hdpe paling murah
luckytoto
slot freebet
https://grup889.com/
Slot Qris
situs slot luar gacor
Slot malam
Slot malam
colombia88
Speak Your Mind